Bronze investment casting parts
Payment Type: | L/C,T/T |
---|---|
Incoterm: | FOB,CFR,CIF |
Min. Order: | 100 Piece/Pieces |
Basic Info
Model No.: SVI-107
Dimension: As Per Drawing/order
Standard: ASTM, ASME, DIN, JIS, ISO, BS, API, EN
Finishing Surface: Machined Surface With Tectyl891, Other Surface Wit
Supply Chain Process: PPAP V
Mould Time: 15-20days
Material: Carbon Steel, Alloy Steel, Aluminum Alloy, Zinc A
Processing: Investment Casting, Lost Wax Casting , Sand Castin
Application: Automotive & Transportation Parts; Fitness Equipme
Certificate: ISO
Custom Bronze Investment Casting Compone: OEM Bronze Investment Casting Component
Additional Info
Packaging: Export cartons, pallets, wooden cases, Polybags or as per client's request
Productivity: 50000pcs per month
Brand: UniSite
Transportation: Ocean,Land,Air
Place of Origin: china mainland(zhejiang)
Supply Ability: 50000pcs per month
Certificate: ISO9001
Product Description
Burnout preheating: The mold is then subjected to a burnout, which heats the mold to between 870 °C and 1095 °C to remove any moisture and residual wax, and to sinter the mold. Sometimes this heating is also used to preheat the mould before pouring, but other times the mould is allowed to cool so that it can be tested. Preheating allows the metal to stay liquid longer so that it can better fill all mould details and increase dimensional accuracy. If the mold is left to cool, any cracks found can be repaired with ceramic slurry or special cements
Main particulars
| MAIN PARTICULARS |
Material for product | carbon steel, alloy steel, stainless steel, aluminum alloy, zinc alloy, brass, gray iron, nodular cast iron, ductile Iron or other specified |
Standard | ASTM, ASME, DIN, JIS, ISO, BS, API, EN |
Certificate | ISO9001, BV |
Dimension | As per drawing, as large as we can |
Processing | Step1:investment Casting, Lost wax Casting , Sand Casting Step2:turning , milling, drilling, grinding, threading, CNC Machining |
Finishing surface | Machined surface with tectyl891, blasting and painting(Hempel, Inter, Sigma, Jotun), anodize, polishing |
Marking | as per clients` requirements |
Inspection | material, construction, dimension, heat treatment, hardness, NDT |
Quality | ISO9001, BV, PPAP control production |
Lead time | 5 days for sample, consult with customer for mass production |
Delivery | Express for sample, ocean shipping/air for mass production |
Our Capabilities | CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, forging, stamping |
Engineering&manufacturing services | R&D process, tooling and gauging design, product design Integrated CAD/CAM system, test and measuring |
Others | Recyclable, in line with environmental requirements and standards, and reliable |
Our Technology and Quality:
Offering our client best possible and most sustainable solutions to their requirement. Production procedure
Step1: Drawing and technical requirement analysis, production lofting;
Step2: Material cutting, trimming, groove, cleaning, bending, rolling, dimension & NDT inspection
Step3: From part assemble to whole assemble with accurate template and platform, dimension & NDT inspection, welding, dimension & NDT inspection;
Step3: Casting, forging, stamping, machining if necessary
Step4: Final dimension & NDT inspection;
Step5: Surface treatment;
Step6: Package, Loading and Lashing when delivery;
UniSite have a perfect managing system and quality control system which from initial work.
ISO9001-2008/CCS; BV manufacturer capability qualification.
Taken part in the CHINA DREDGING ASSOCIATION
Quality, health, safety and environment (QHSE)
Production guidelines
In-house safety training to our staff
Checking all the production equipment periodically
Preventing pollution, accidents and health hazards, auditing
See to following photos:
:
Photos of our Custom bronze investment casting components
How to contact us?
Send your Inquiry Details in the Below, Click "Send" Now!
Product Categories : Casting Parts > Bronze Casting Parts